Project Description

This was a rail-loading station for fuel oil that must allow five rail cars to be loaded at one time. McCrossin built the concrete containment area, concrete rail road piers, loading station, electrical systems, mechanical 14” weld piping, stainless air piping, and fiberglass drain piping. Our teams installed caissons inside of a containment dike that had no access for equipment, so in response, an auger attachment was fitted to an excavator. The excavator was able to reach the pile location that was not accessible for a traditional drill rig. McCrossin finished the project on time, and the site was exporting oil by rail car before deadline.

Project Details

Job Name: PPL Martin’s Creek Fuel Oil Loading Station

Job Location: PPL Martin’s Creek

Start Date: March, 2011

Completion Date: August, 2011