McCrossin was responsible for all cast-in-place conctere for the erection of this new 12-story commericial and residential high-rise in downtown State College. The building will have retail space on the first floor, office rooms on the 2nd, and rental apartments on the remaining floors.
Some of the tasks we completed were:
- Footings
- Cast-in-place walls (one- and two-sided forms)
- Corewall construction using jump form
- Slab on grade
- 2” topping slab elevated precast parking garage
- Elevated landings at stairs and elevators
- Cast-in-place elevated slabs, drop slab, and beams
- At-grade footings
- Sidewalks
- Curb and gutter
- Handicap ramps
- Geo foam insulation decks
- Concrete landing fills
- Concrete step fills
- Foundations for two tower cranes
Project Details
Job Name: Metropolitan
Job Location: State College, Pennsylvania
Start Date: February, 2015
Expected Completion Date: Summer 2017